City of houston
Strategic Purchasing Division
Quick List: Suppliers | Contracts

Building and Building Equipment & Supplies

Building and Building Equipment & Supplies Budget Information:
Allotted:
$41,613,719.20
Total Usage:
$19,687,675.20
Remaining:
$21,926,044.00

This category consists of but is not limited to asphalt emulsion, fence material, flexible base material, lumber, pipe, and pvc fittings.

Subcategories in Building and Building Equipment & Supplies

City spending across the top 7
Building and Building Equipment .. categories:

  • Road & Con.. (26%)
  • Facility M.. (19%)
  • Roof Repairs (18%)
  • Fence Mate.. (16%)
  • Hardware R.. (15%)
  • Building S.. (3%)
  • Pipe, PVC .. (2%)
Building Service & Maintenance

Building Service & Maintenance

Allotted: $1,395,651 (3.4%)
Facility Maintenance

Facility Maintenance

Allotted: $7,994,561 (19.2%)
Fence Materials

Fence Materials

Allotted: $6,849,744 (16.5%)
Flexible Base Material

Flexible Base Material

Allotted: $0 (0%)
Hardware Related Items

Hardware Related Items

Allotted: $6,419,616.48 (15.4%)
Lumber

Lumber

Allotted: $0 (0%)
Pipe, PVC & Fittings

Pipe, PVC & Fittings

Allotted: $821,854.86 (2%)
Road & Concrete Supplies

Ready Mix Concrete, Asphalt Emulsion and Cement Bagged Produ...

Allotted: $10,632,291.76 (25.5%)
Roof Repairs

Roof Repairs

Allotted: $7,500,000.00 (18%)
Steel Construction Materi..

Steel Construction Materials

Allotted: $0 (0%)